For commercial premises with electrical findings to resolve
Commercial EICR Remedial Works in Scotland
Turn your electrical report into a practical repair plan. WB Electrical reviews the findings, scopes the corrective work and completes agreed repairs with testing and records for your site file.
Supporting businesses, industrial sites and public-sector premises across Glasgow, Lanarkshire and the Central Belt from our Larkhall base.

Clear priorities. Defined repairs. Recorded completion.
Start with the observations and their urgency
Know what needs attention first
An Electrical Installation Condition Report (EICR) identifies observations with different priorities. If yours is marked unsatisfactory or describes outstanding issues, we help establish what needs attention and what information is needed before quoting.
C1 and C2 findings
C1 identifies immediate danger; C2 identifies potential danger needing urgent remedial action. If danger remains, contact a competent electrician straight away. Do not wait for a routine online quotation.
Further investigation (FI)
An unresolved issue needs closer examination before its nature and repair scope can be confirmed. Arrange investigation promptly and follow the advice on your particular report.
Recommended improvements
C3 observations recommend an improvement. We distinguish these from urgent defects so you can consider them alongside site risks, maintenance priorities and other planned work.
Follow the inspecting electrician’s safety instructions. Keep isolated equipment out of service until a competent electrician confirms it can be used safely.
An agreed scope for the fixed installation
Electrical repairs shaped by your report
The repair package follows the actual observations, test results and site assessment. Depending on the findings, electrical remedial works may include:
Wiring and accessories
Repairing damaged wiring, connections, sockets, switches or isolators, with suitable cable protection and identification where needed.
Earthing and protection
Correcting identified earthing or bonding defects and addressing protective-device or residual current device (RCD) issues, with compatibility and circuit condition checked.
Distribution equipment
Addressing defects in boards, enclosures and associated equipment. A board replacement is considered where the condition and required work justify that scope.
A report code alone is not enough to select parts or price every repair. Unclear circuit references, missing results or further-investigation findings may require a site visit before a fixed remedial quotation.
Supply equipment owned by the network operator or landlord, specialist machinery and hazardous areas need clear responsibilities. Tell us about additional power sources and specialist systems when enquiring.
Agree the work, access and interruption together
Plan repairs around your working site

Plan for a controlled power interruption. Repairs need safe isolation and appropriate checks. Identify production equipment, servers, refrigeration and other critical services so the work window reflects their shutdown and restart needs.
01
Review the complete report
Share the observations, schedules and test results, plus any photographs already available. Identify previous repairs, immediate safety measures and the person requesting completion evidence.
02
Agree the package and programme
Confirm included observations, investigation needs, materials, permissions and the site contact. Discuss shutdowns, tenants and specialist-system providers. Phased or out-of-hours work is considered by agreement.
03
Complete, check and hand back
Carry out the authorised work, inspect and test the affected installation, and communicate its status before handover. Additional findings and outstanding actions remain clearly identified.
If investigation reveals more work, we explain the finding and agree the additional scope. Temporary isolation, investigation and completed repairs remain separately recorded.
Need to coordinate repairs or a shutdown? Discuss your remedial work with WB.
From reported observations to recorded action
Know what has been completed
A record against the findings
- The report observation, circuit or location addressed.
- What was repaired, investigated or left outstanding.
- Relevant inspection and test results for the completed work.
- Applicable certification and any follow-up recommendation.
For several buildings or visits, retain the site and observation references so your team can track completed and open items.
Certificates matched to the work
An Electrical Installation Certificate covers work such as new circuits or a distribution-board replacement. A Minor Electrical Installation Works Certificate may suit smaller alterations that do not introduce a new circuit.
Investigation or maintenance tasks may instead need appropriate test and completion records. We identify the documents relevant to the agreed work.
Keep the original EICR with the subsequent records. Repairing selected circuits does not establish the condition of untouched areas. If a fresh EICR or particular confirmation is required, agree that reporting scope before work starts.
Evidence from a working industrial estate
Remedial experience at operational sites

North British Distillery
WB’s published North British Distillery case study includes EICR inspections and identified remedial works, earthing tests, wiring repairs and distribution upgrades.
The relationship shows how corrective work can sit within ongoing industrial support: define the task, coordinate access and isolation, then test and document the completed electrical scope. Your programme is assessed against your own premises and priorities.
Supplier assurance
Review the current evidence for contractor selection, electrical membership and management-system certification. Tell us about any procurement requirements when enquiring.
Practical answers before authorising the work
EICR remedial works questions
Can you work from another contractor’s EICR?
Yes. Provide the full report, including its schedules and observations. We review the findings and may need clarification or a site assessment before quoting. The original inspector remains responsible for their report; WB’s records describe the work and verification we undertake.
Does an unsatisfactory EICR mean we need a rewire?
No. The extent of repair depends on the defects and installation condition. Targeted repairs, investigation or a defined upgrade may be appropriate. A recommendation for substantial replacement should have a clear technical basis; age alone does not settle that decision.
Do all C3 observations have to be repaired?
C3 means an improvement is recommended and does not by itself make the assessment unsatisfactory. Consider the recommendation in the context of the premises, other planned work and any specific written requirement. We can identify it separately in the quotation.
Will repairs automatically produce a new satisfactory EICR?
The original report remains a dated record. We test the work completed and provide the applicable records. A fresh EICR is a separate inspection scope if needed; it must reflect any remaining defects or limitations. Confirm an insurer or landlord’s required evidence before booking.
Can commercial remedial works be completed in stages?
A phased programme may be suitable where the installation can be managed safely between visits. Immediate danger must be addressed straight away and other urgent findings need prompt attention. Some equipment may need to remain out of use while repairs are pending.
The right route for the requirement
Related electrical services
Need the condition assessed?
Arrange fixed-wire inspection when you need to establish the installation’s condition and obtain an EICR.
A larger board project?
Explore replacement or upgrade work when the distribution arrangement needs a broader design and changeover scope.
A specific evidence request?
Identify the electrical records relevant to an insurer, landlord or audit request before commissioning more work.
Start with the report and what remains open
Request a remedial quotation
Tell us about the premises and the outstanding findings. The next step may be a document review, an investigation visit or a defined repair quotation.
Information that helps us quote
- Company, site address and the relevant building or area.
- Full EICR, including observations, schedules and test results.
- Known safety measures, previous repairs and items still open.
- Any deadline or written insurer, landlord or auditor request.
- Site contact, working hours, critical equipment and access restrictions.
Mention your report or photographs in the enquiry; the office will confirm how to share them. If you only have a summary, tell us. Do not open electrical covers to obtain information.
What affects EICR remedial cost?
The nature and number of defects, investigation needs, materials, access, working hours and testing requirements affect cost. A list of codes without the observations rarely defines the whole repair package.
Compare the included investigation, repairs, testing and records when reviewing quotations. We identify the agreed scope and any assumptions before booking.
Suitable larger or multi-site requirements elsewhere in Scotland are considered by agreement. For a home or residential letting, use the domestic quote route.