Project case study | Client relationship since 2018

Workplace EV Charging Installation for Procladd in Hamilton

Bank of Easee workplace EV chargers installed for Procladd in Hamilton

From day-to-day electrical support to workplace charging

A larger workplace charging project built on years of lighting, small-power, inspection, testing and reactive electrical support.

Since 2018

Client relationship

10 chargepoints

Installed at Hamilton premises

2025 project

Commercial EV installation completed

Up to 22 kW

Maximum unit rating

The relationship

An Established Electrical Relationship That Led to Workplace Charging

WB Electrical has supported Procladd at its Hamilton premises since 2018. The relationship began with practical electrical requirements such as lighting repairs, socket installations, additional spurs, fault finding, EICR inspections, PAT testing and reactive maintenance.

In 2025, that established relationship developed into a larger project: the installation of 10 black Easee commercial EV charger units for staff and business use at Bothwell Bridge Business Park. WB Electrical delivered the associated electrical installation, setup, testing and handover.

Project setting and requirements

  • Existing commercial premises
  • Staff and business vehicle use
  • Multiple authorised users
  • On-site parking and charger locations
  • Ongoing electrical support requirements

The challenge

Adding Multiple Chargepoints to an Existing Workplace

Installing multiple workplace chargepoints is more involved than mounting equipment beside parking spaces. The electrical supply, distribution, protection, cable routes, charger locations, user access and commissioning requirements all need to work as one installation.

Working business premises

The installation had to be planned for an occupied business premises, with access and work areas coordinated around normal site activity.

Electrical capacity and distribution

Ten charger units create a different electrical design question from one isolated chargepoint. Available capacity, circuit arrangement and the intended pattern of use all matter.

Parking and cable routes

Charger positions and containment routes need to suit the parking layout, physical environment, electrical source and the way users approach the spaces.

User access and operation

Procladd needed a practical way to control who could use the chargers. Easee Keys were supplied for access by authorised users.

The charger is only one part of the project: a useful workplace system also depends on the electrical infrastructure, parking arrangement, user access, testing, certification and a clear handover.

The work delivered

From Site Review to Tested Workplace Charging

The recorded project combines the physical charger installation with the supporting electrical work, commissioning and access arrangements needed to bring 10 workplace charging points into use.

01

Site and Infrastructure Review

  • Charging requirement and proposed parking arrangement
  • Existing electrical supply and distribution context
  • Proposed cable routes and charger locations
  • Access and sequencing within a working premises
  • Grant and evidence position at the time of the project

02

Electrical Installation

  • 10 black Easee commercial EV charger units
  • Associated circuits, protection and containment
  • Suitable isolation, labelling and identification
  • Installation coordinated around the premises and parking area
  • Equipment setup ready for commissioning

03

Commissioning and User Setup

  • Electrical inspection and testing
  • Charger setup and functional checks
  • Easee Keys for controlled user access
  • Operational handover for the agreed users
  • Certification and completion information

04

Wider Electrical Relationship

  • Lighting repairs and replacements
  • Socket installations and additional spurs
  • EICR inspections and associated remedial works
  • PAT testing and electrical records
  • Fault finding, small works and reactive maintenance

Relationship evidence: The EV installation was not a one-off visit. It developed from a client relationship in place since 2018 and sits alongside continuing electrical maintenance, testing and small works.

Project evidence

Ten Chargepoints Installed at the Hamilton Premises

The project photographs show the installed bank of workplace chargers and the site work behind the finished system. Together they provide direct visual evidence of the 10-point installation described on this page.

WB Electrical engineer working on the Procladd workplace EV charger installation
Installation work in progress at Procladd’s Hamilton premises.
Bank of Easee workplace EV chargers installed for Procladd in Hamilton
The completed bank of Easee charger units mounted at the workplace parking area.

The delivery approach

A Practical Sequence for an Existing Workplace

01

Define the Charging Requirement

Confirm the intended users, number of charging spaces, vehicle patterns, parking arrangement and the information already available for the site.

02

Review Supply and Routes

Review the electrical context, proposed charger positions, cable routes, access requirements and any isolation or sequencing needed for the premises.

03

Install and Commission

Install the agreed charger units and associated electrical infrastructure, then complete the inspection, testing and setup relevant to the installation.

04

Handover and Support

Provide the agreed access tools, certification and completion information, explain the system handover and identify any separate follow-on recommendation.

Grant and project context

The Grant Terms Were Specific to the 2025 Project

The Procladd installation was planned under the Workplace Charging Scheme terms available in 2025. At that time, eligible projects could receive support of up to 75% of costs, capped at £350 per socket.

That historical figure belongs to this project record. Grant values, eligibility rules, installer requirements and completion deadlines can change, so they should be checked afresh for every new enquiry.

Current details are published on the official Workplace Charging Scheme page. A grant should not be assumed until the applicant, site, equipment, installer and timing have been checked against the live rules.

Information that supports a better EV review

  • Site address and parking layout
  • Number and type of users or vehicles
  • Typical dwell times and charging priorities
  • Available supply and known electrical records
  • Current and future number of chargepoints

Testing and handover

A Working System With a Defined Handover

The end of the installation should leave the client with a working system, defined user access and clear evidence of what was installed, tested and handed over.

  • Electrical inspection and testing appropriate to the installation
  • Charger setup, functional checks and commissioning
  • Easee Keys and the agreed user access arrangement
  • Certification and completion records relevant to the work
  • Practical handover and any separate follow-on recommendation

Project evidence

What This Case Study Demonstrates

10-Point Installation

Ten commercial charger units installed at one workplace as a coordinated electrical project.

Existing Site Knowledge

A client relationship since 2018 gave the project a practical foundation in the existing premises and electrical requirements.

Controlled User Access

Easee Keys provided a defined access method for authorised workplace users.

Wider Electrical Support

The charger project sits alongside lighting, small power, testing and reactive maintenance support.

More evidence from working sites

Explore Related Project Case Studies

Distillery and warehousing

North British Distillery

Planned, reactive, compliance and infrastructure support across live industrial sites.

Read the project case study

Public-sector estates

Scottish Ambulance Service

Long-term planned, reactive and compliance support across a dispersed operational estate.

Read the project case study

Manufacturing and industrial

Bridon-Bekaert

Industrial electrical support spanning operation, improvement and decommissioning work.

Read the project case study

Project questions

Frequently Asked Questions

What did WB Electrical install for Procladd?

WB Electrical installed 10 black Easee commercial EV charger units at Procladd’s Hamilton premises. The recorded scope includes the associated electrical installation, setup, testing, certification, user access arrangements and handover.

Does a 22 kW charger always deliver 22 kW?

No. The figure describes the charger unit’s maximum rated capability under suitable conditions. Actual charging power depends on the vehicle, electrical connection, available site capacity, installation design and any load-management arrangement.

How was access to the workplace chargers managed?

Easee Keys were supplied to support controlled use by authorised users. The appropriate access and billing arrangement for another workplace would depend on its users, operating model and chosen charging platform.

Did grant support apply to the Procladd installation?

Yes. The 2025 installation used the Workplace Charging Scheme terms available at that time, when support was capped at £350 per socket. Current values, eligibility, equipment, installer and deadline requirements must be checked against the live official scheme before a new project is costed.

Can workplace EV charging sit alongside wider electrical support?

Yes. Procladd’s charger installation developed from an existing relationship covering lighting, sockets, EICR, PAT testing, fault finding and reactive maintenance. For another site, WB would first review the charging requirement, premises, electrical context, parking, users and programme.

Commercial EV charging across Scotland

Planning Workplace EV Charging?

Tell us about the site, parking, number of spaces, expected users or vehicles, typical dwell times and any known electrical supply information. We will review the enquiry and advise on a practical next step.